【导读】华图福建学历教育考试网同步学历文凭考试网发布:2018成人高考专升本《英语》考前提分练习及答案二02,详细信息请阅读下文!如有疑问请加【福建学历教育考试招考汇总】 ,更多资讯请关注福建华图公务员微信公众号(fjhuatu),福建学历教育培训咨询电话:0591-87618197;88780197 饭饭老师微信号:18959130107
Passage Four
A few years ago, Paul Gerner began to gather a group of architects in Las vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning . ”I think half of then fell off their chairs,” Gerner says.
Gerner manages school facilities (设施)for Clark county, Nevada, a district roughly the size of Massachusetts. By 2018, 143, 000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (样品) ; They plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.
Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. ”One of the biggest challenges is getting the right site orientation(朝向), ” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”
Surprisingly, the man responsible for one of re most progressive green-design competitions has doubts about ideas of eco-friendly buildings. ”I don’t believe in the new green religion,” Gerner says. ”Gerner says.”Some of the building technologies that you get are impractical. I’m interested in those that work. ”But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. ”You never know what’s going to start the interest of a child to study math and science,”he says.
48.How did the architects react to Garner’s design requirements?
A. They lost balance in excitement.
B. they showed strong disbelief.
C. they expressed little interest.
D. they burst into cheers.
49.Which order of steps is followed in carrying out the project?
A. Assessment-Prototype-Design-Construction.
B. Assessment-Design-Prototype-Construction.
C. Design-Assessment-Prototype-Construction.
D. Design-Prototype-Assessment-Construction.
50.What makes it difficult to build green schools in Clark County?
A. The large size.
B. Limited facilities.
C. The desert climate.
D. Poor natural resources.
51.What does Gerner think of the ideas of green schools?
A. They are questionable. C. They are advanced.
B. They are out of date. D. They are practical.
备考有疑问 华图为你解答
扫一扫,添加华图微信客服
微信号:18959130107
贴心微信客服
3万+
阅读量150w+
粉丝1000+
点赞数
福建华图微信
福州市鼓楼区五四路82号融都国际大厦2层
客服热线:0591-87618197
网站:https://fuzhou.huatu.com